Electrical panel quality control you can verify

Every Accu-Panels LT panel, whether power, control, solar or EV, is built to a written Quality Assurance Plan, inspected at three stages and routine-tested to IEC 61439 before it leaves the factory. Nothing ships without a signed test certificate.

  • 100% of panels routine-tested before dispatch
  • 3-stage inspection: incoming, in-process, final
  • CPRI type-tested design to IEC 61439-1/2
  • IP65 & IP66 outdoor panels built on order

01

Four pillars of our quality

✓

Certified system

ISO 9001:2015 quality management and MSME ZED practices run every department.

⚡

Every panel tested

Eight routine checks to IEC 61439-1, recorded on a signed certificate.

◈

Built to protect

IP42 indoor panels up to IP65 and IP66 outdoor builds, with measured coating.

≡

Traceable records

Registers at each stage, ERP-based tracking and documents that ship with the panel.

02

Our quality policy

Accu-Panels Energy Pvt. Ltd. designs and manufactures LT electrical panels known for lasting quality and good workmanship. We commit ourselves:

  1. Customer satisfaction. To reach and hold 100% customer satisfaction by continually improving product quality and on-time delivery, and by cutting internal rejection and waste.
  2. Infrastructure. To keep improving our plants and facilities so the company can grow faster and serve customers better.
  3. People. To build the skills of our team, so individual and team performance improves and quality becomes part of our culture.
  4. Compliance. To meet all applicable legal and statutory requirements.
  5. Review. To review our quality management system at regular intervals and keep improving it.

Managing DirectorAccu-Panels Energy Pvt. Ltd. · Shared with, and understood by, everyone in the company.

03

Certifications and capabilities

Copies of our certificates and the CPRI type-test report are shared with every techno-commercial offer on request.

04

Three-stage inspection

A panel is only as good as the parts inside it and the way they are put together. Select a stage to see what we check.

Incoming inspection

  • Switchgear, meters, CTs, terminals and glands checked against the PO and BOM for make, rating and quantity
  • CRCA sheet and wires checked visually and with vernier and wire gauge
  • CTs given injection and polarity checks
  • Anything that does not match goes back through purchase

Record · Material inward and incoming inspection register

In-process inspection

  • 100% of fabricated parts measured for length, width, height and sheet thickness against the drawing
  • Parts checked again before painting; coating thickness and shade checked after
  • Busbar dimensions checked against the switchgear rating
  • Assembly, door, handle and interlock alignment checked on the shop floor

Record · Production and in-process inspection register

Final inspection

  • Full routine test procedure on every panel
  • Final check of quantity, specification and finish against the order
  • Panels that fail are held in the non-conformity area
  • Only panels that pass are released for packing and dispatch

Record · Final inspection report and routine test certificate

05

Routine tests on every panel

These eight checks follow IEC 61439-1, clause 11. Tap a test to see how it is done.

01Degree of protectionPASS

Enclosure, gaskets, gland plates and door seals checked against the specified IP rating.

02Clearances and creepagePASS

Distances verified against the design values for the rated insulation voltage.

03Mechanical operationPASS

Breakers, interlocks, drawout mechanisms and doors operated and checked.

04Wiring and functionPASS

Point-to-point wiring check against the approved schematic, ferrule and label audit, functional, interlock and two-lamp continuity tests.

05Dielectric (HV) testPASS

2.5 kV AC for 1 minute between live parts and earth, and between phases.

06Insulation resistancePASS

500 V / 1000 V megger test before and after the HV test. Minimum 1 MΩ per circuit.

07Torque auditPASS

Busbar and terminal bolts checked to the manufacturer's torque table and marked.

08Protective circuit continuityPASS

Earth continuity checked to every door and compartment.

06

Additional in-house tests

Added as the panel type and the client's QAP require.

TestWhat we check
Mechanical enduranceRepeated closing and opening of ACBs, SFUs, MCCBs and MCBs; every interlock and tripping mechanism
Primary and secondary injectionRelays, releases and CT circuits, with CT polarity
HV, isolator open and closedBetween phases and to the earth busbar, with the isolating switch in both positions
Control circuit simulationFeeder operations, remote indication lamps and remote controls
Pick-up and drop-outVoltages for shunt-trip and closing coils
RS-485 / ModbusMeter and relay communication tested with software
Client QAP extrasPhase sequence and clearance measurements with photographs, when asked

07

Coating and enclosure protection

Powder coating, measured

Surface preparation is checked visually, thickness with a DFT meter and shade against a shade card, usually RAL 7035.

60–80 µmStandard indoor panels
80–120 µmOutdoor, solar and coastal panels

For coastal and very humid sites, read our C5 coating guide.

IP rating, built to the site

We build panels from IP42 for clean indoor rooms up to IP65 and IP66 for outdoor, dusty and wash-down areas.

CodeDustWater
IP42Objects over 1 mmDripping water
IP54Dust-protectedSplashing water
IP55Dust-protectedWater jets
IP65Dust-tightWater jets
IP66Dust-tightPowerful water jets

IP codes as defined in IEC 60529.

08

Testing instruments and calibration

Every instrument used for acceptance is calibrated on schedule, so a reading on our certificate means the same at your site.

  • HV test set
  • Megger
  • Multimeter
  • Series lamp
  • Torque wrench
  • DFT meter
  • Shade card
  • Vernier calliper
  • Measuring tape
  • Wire gauge
Electrical panel inspection with vernier calliper, measuring tape and multimeter at Accu-Panels

09

QAP and witnessed inspection

Our QAP lists each check, how much is checked, the acceptance rule, the record and the instrument. We also work to the QAP of EPC contractors and solar developers.

QAP stageAccu-PanelsClientTPIA
Fabrication and pre-paint inspectionPRW
Switchgear, busbars and bought-out itemsPRW
Surface cleaning and powder coatingPRW
Power charging and final testingPRW

P = perform · R = review · W = witness

Every panel ships with

  • Routine test certificate
  • Warranty certificate
  • Approved drawings
  • Bill of materials
Electrical panel quality control infographic: certifications, inspection and testing at Accu-Panels

10

When something is not right

  1. HoldA failed part or panel goes to the non-conformity area, so it cannot be dispatched by mistake.
  2. Find the causeFor critical failures we stop, find the root cause and fix it before work restarts.
  3. ImproveQuality, cost and delivery are reviewed every morning, defect trends every month, under our ZED practices.

11

Build quality commitments

A well-built panel lowers the risk of fire, equipment failure and costly shutdowns, and stays ready for tomorrow's loads.

  • MaterialMild steel and CRCA with anti-corrosive powder coating; stainless steel for special environments.
  • StructureWelding, sheet thickness and frame strength inspected for a rigid, damage-resistant enclosure.
  • ComponentsCopper busbars, and switchgear from globally trusted brands such as ABB, Schneider Electric and Siemens.
  • LayoutLogically arranged, clearly labelled components for safe operation and quick fault-finding.
  • ProcessERP systems and SOPs give traceability and consistency across every department.
  • ProtectionIP42 to IP66 enclosures, matched to the site.

12

After-sales support and client trust

WarrantyAcross our entire product range
24×7Support for troubleshooting, repairs and upgrades
10+Countries, including India, Africa and the UAE

13

Frequently asked questions

What tests are done on every electrical panel?

Eight routine checks under IEC 61439-1 clause 11, including the dielectric test, insulation resistance, torque audit, wiring and function checks, and earth continuity. Results go on a signed routine test certificate.

Do you build IP65 and IP66 panels?

Yes. We build panels from IP42 for indoor rooms up to IP65 and IP66 for outdoor, dusty and wash-down areas, on order.

Can our team or a TPIA witness the inspection?

Yes. Clients, consultants and third-party inspection agencies can witness the factory acceptance test, to our QAP or to your project QAP.

Which certifications does Accu-Panels hold?

ISO 9001:2015 (TÜV SÜD), MSME ZED, CPRI type tests to IEC 61439-1/2, an ASTA certificate from Intertek, and CE marking for export panels.

How thick is the powder coating?

60–80 microns DFT for standard indoor panels and 80–120 microns for outdoor, solar and coastal panels, measured with a DFT meter.

What documents come with the panel?

A routine test certificate, warranty certificate, approved drawings and the bill of materials. Explore our PCC, MCC and 800 V LT panel ranges.

Factory acceptance test

Witness your panel's tests

Your engineers, consultants or TPIA are welcome at our factory. Ask us for certificate copies, our QAP or a test date.